I managed to drag two of the six walnut beams into my shop yesterday. A few passes with a hand plane gave me my first look at what was waiting for me. A few checks and cracks but nothing that can’t be stabilized. Moisture is a little on the high side but it’ll come down over the next few weeks. Building this Roubo will be an exercise in timberframing before cabinetry. I still have a lot of decisions to mull over… face or edge grain for the top, cabinets below or open space… who can I trick or bribe into helping me rip them down on the bandsaw.